Procedure Name Application to obtain a License to Conduct a Survey of Transmission of Electricity
Description

Electricity Rules, 2050 (1993)


Section 5. Application to be submitted to obtain a License to Conduct a Survey of Transmission of Electricity:- Any person or corporate body who is interested to conduct a survey of transmission of electricity shall ha ve to submit an application in triplicate stating the following particulars relating to the electricity transmission project to the Secretary through the Electricity Development Department in the format as prescribed in Schedule-3:-

(a) Preliminary route-map of electricity transmission line (proposed main transmission line and alternative line also should be shown),

(b) Necessity, purpose and total length of the transmission line,

(c) Standard and capacity of voltage to be used for transmission,

(d) If the electricity is to be supplied at once Maximum load of electricity and types of consumers,

(e) Estimated amount of cost and time for the completion of transmission line (both the survey and construction),

(f) Other necessary matters.
 

Category Procedure


Title Description Create Date Update Date Issued By File
Application form to be submitted to obtain a License to Conduct a Survey of Transmission of Electricity Format of Application form to be submitted to obtain a License to Conduct a Survey of Transmission of Electricity 2017-04-21 2017-04-21 Ministry of Energy



Name Measure Type Agency Description Comments Legal Document Validity To Measure Class
Application to be submitted to obtain a License to Conduct a Survey of Transmission of Electricity Permit Requirement Ministry of Energy Application to be submitted to obtain a License to Conduct a Survey of Transmission of Electricity Comments Electricity Regulation 2050 (1993) 9999-12-31 Goods