Legal Documents
View Procedure
Procedure Name | Application to obtain a License to Conduct a Survey of Transmission of Electricity |
Description | Electricity Rules, 2050 (1993)
(a) Preliminary route-map of electricity transmission line (proposed main transmission line and alternative line also should be shown), (b) Necessity, purpose and total length of the transmission line, (c) Standard and capacity of voltage to be used for transmission, (d) If the electricity is to be supplied at once Maximum load of electricity and types of consumers, (e) Estimated amount of cost and time for the completion of transmission line (both the survey and construction), (f) Other necessary matters. |
Category | Procedure |
Title | Description | Create Date | Update Date | Issued By | File |
---|---|---|---|---|---|
Application form to be submitted to obtain a License to Conduct a Survey of Transmission of Electricity | Format of Application form to be submitted to obtain a License to Conduct a Survey of Transmission of Electricity | 2017-04-21 | 2017-04-21 | Ministry of Energy |
Name | Measure Type | Agency | Description | Comments | Legal Document | Validity To | Measure Class |
---|---|---|---|---|---|---|---|
Application to be submitted to obtain a License to Conduct a Survey of Transmission of Electricity | Permit Requirement | Ministry of Energy | Application to be submitted to obtain a License to Conduct a Survey of Transmission of Electricity | Comments | Electricity Regulation 2050 (1993) | 9999-12-31 | Goods |